We start from how long vehicles stay and what the supply can carry, then choose the chargers to fit.
- Dwell-time and demand study
- Grid capacity and load management
- Layout, permits and phasing
EV charging for business sites
We survey the site, design the load, build it and keep it running. One team, from the grid connection to the last invoice.
What you can expect
Not a track record, a promise: what a typical site gets.
150kW
Per DC bay
CCS2 connectors, with a cooled cable on the high-power bays.
13weeks
Survey to handover
A single site, permits included.
99.5%
Uptime target
Measured monthly and reported to the site owner.
24/7
Remote monitoring
An engineer looks at a fault before a driver reports it.
What we do
Four jobs, done by the same people, so nothing is lost between them.
We start from how long vehicles stay and what the supply can carry, then choose the chargers to fit.
Trenching, switchgear, chargers and commissioning, delivered as one job with one site manager.
Monitoring, billing and support, so the chargers are working when a driver arrives.
More bays, more power or new software on a site that is already running.
How a job runs
You deal with one person from the survey to the handover.
Week 1
We walk the site, read the supply and count how long vehicles stay.
Weeks 2 to 3
A layout, a load plan and a fixed price, before anything is ordered.
Weeks 3 to 8
The grid application, planning and any landlord consents, handled by us.
Weeks 8 to 12
Groundworks, switchgear and chargers, with as little disruption to the site as we can manage.
Week 13
Commissioning, training for your team and, if you want it, a monitoring contract.
Selected work
Depots, car parks and corridors. Drag the row, or use the arrows.
What clients say
They told us what the supply could carry before they sold us a single charger. That is why the site still works.
One point of contact from the survey to the handover. We never had to chase anyone.
The bays were live a week before the date we were given.